Close

Icebreaker, NB-510

The icebreaker features the highest technology and has been designed especially for the demanding icebreaking operations in the Baltic Sea. The icebreaker will be powered by both diesel and LNG.

Client: Arctech Helsinki Shipyard

Technical information of the vessel:

Length: 110 m
Breadth: 24 m

Propulsion: 19 MW

Speed: 16 knots

 

Etteplan was commissioned to conduct the FE analyses, the strength and fatigue calculations with global and local FE models as well as vibration FE-analyses with a global FE-model.

(Source: Arctech Helsinki Shipyard)

Related content

Etteplan provides CFD for Normet as a part of continuous service in engineering and development

Normet is a fast growing and innovative company with a mission to lead the transformation into a more digital and sustainable tomorrow. Within underground mining and tunnelling, they have amassed process expertise in over thousands of projects all over the world. Normet has over 50 years of experience in the industry, over 13000 delivered machines and over 1400 professionals working for the company. Normet’s mission is to lead transformation into digitalized and sustainable underground mining and tunnelling.

Creating a digital era dental robot

Rayo 3DToothfill aims to improve the lives of billions of people with affordable, high-quality dental health. Their solution provides the best results with comparable costs for the dentist and for the patients. To ensure their solution is usable in different surroundings, it is simple and easy-to use.