
Here’s why investing in ILS during a Defence tender pays off
Integrated Logistic Support (ILS) is required in Defence tenders, but few suppliers develop it. This article shows why it pays off more in the long run than skipping it, and how to start small.
In short
- Investing time in Integrated Logistic Support (ILS) during the tender pays off more in the long run than skipping it.
- Defence buys a capability that must stay operational for decades. Once 20% of life cycle costs have been spent, more than 80% of costs is already locked in.
- A first ILS step can be small: an analysis of critical spare parts or an early maintainability check.
ILS isn't a minor issue for the Department of Defense
Integrated Logistic Support (ILS) governs how a system stays operational after delivery. In the tenders I see, ILS keeps coming back as a requirement.
Defence does not buy a product, but an operational capability that must stay operational for decades. Sustainment therefore weighs as heavily as the technology itself. The question behind every ILS requirement is: what does it cost to keep this system running for the coming decades?
Early choices lock in life cycle costs
Once 20% of life cycle costs have been spent, more than 80% of them are already locked in. This is shown by a statistical analysis of Department of Defense projects by the Defense Acquisition University. (Opens in new tab) The National Research Council cites that analysis in the report Examination of the U.S. Air Force's Aircraft Sustainment Needs in the Future and Its Strategy to Meet Those Needs (2011, chapter 3).
The figure comes from American defence projects. It is not about your investment, but about Defence's challenge of keeping a system operational after delivery. This is how I read it: that challenge weighs on every tender.
Few suppliers deliver a fully developed support concept
In my experience, few suppliers deliver a system with a fully developed support concept. Rarely because they don't want to deliver ILS. Mostly because they:
- don’t know exactly what is being asked
- think it is expensive and time-consuming
- have to move on without resolving it because of the tender deadline
So they push it back. Another project, another tender, postponed again.
How a vicious circle emerges
Defence cannot stop procuring because suppliers don't have ILS in place. The operational need doesn't wait, and the reasons behind ILS requirements remain. Tenders therefore continue, even when the ILS response falls short. I see no hard market correction forcing suppliers to get this right after all.
If you decide to bid, ask yourself what budget and lead time you need to meet the requirement as well as possible. If you don't know, you are working with wrong assumptions. Then it is easier to let the requirement go than to price yourself out of the market or submit an offer you can't fully stand behind.
How to get started with ILS: the first two steps
You don't have to go from 0 to 100% at once. A small first effort shows that you understand what Defence needs after delivery. That is more than compliance: it shows you are thinking along.
Setting up a full ILS package during the tender feels expensive and slow. That very fear holds companies back. In my experience, two limited steps do fit within the period in which you prepare your offer.
Analysis of critical spare parts
Map which spare parts are critical, what their lead time is, and where a shortage brings the system to a halt.
Early maintainability check
Can you show in a few sentences how a failure is fixed, by whom, and with what resources? A short check answers that.
Set yourself apart and gain a competitive edge with ILS
I see that most competitors struggle with the same questions. So it is not about checking one more box than the rest. Anyone who gets started with ILS, even with a small part at an early stage, stands out. And I expect this to also stand out to customers in the commercial sector who are looking for a supplier that understands their world.
This also applies to suppliers who have worked for Defence for years. They too often get stuck in the same minimal approach per project. Every tender is a chance to take Integrated Logistic Support to a higher level. In the long run, the edge builds up for those who do it a little better every time, no matter how long you have been at it.
Don't let the practical challenges of ILS hold you back
Companies know ILS is required and want to deliver it. Yet they let it slide, because the first step feels unclear. That ILS makes a positive contribution is beyond doubt. The question is how to not let the unknown hold you back and take the first step.
From experience, I know that first step is usually smaller than expected. That is where you make the difference.
Want to discuss your ILS challenge?
Want to know what a first ILS step looks like for your system? Contact me. I'm happy to help you get the most out of ILS for your business.
About the author
Okke Pieters
Team Manager ILS

About the author
Okke Pieters
Team Manager ILS
I am Okke Pieters, Team Manager ILS at Etteplan. In various roles, I have closely experienced what it takes to set up and implement Integrated Logistic Support, as well as where things often go wrong in practice. In my current role, I work with organizations that want to enter the defense market, aim to use ILS as a distinctive competitive advantage, or are seeking the right balance between technology and support. Interested in Integrated Logistic Support? I regularly share insights and practical experiences. Follow me on LinkedIn or reach out to me for a meaningful conversation about your situation if you want to know more about ILS.
Webinar Recap: Seize Opportunities in the Defence Sector
Etteplan hosted an informative webinar on opportunities in the defence sector, themed "TechDoc in the Defense Sector: Ensure Compliance and Increase Your Profitability". During the webinar, key topics were discussed, including important standards and guidelines as S1000D and Simplified Technical English (STE), Integrated Product Support (IPS), and best practices for implementation.